ASSESSING THE IMPACT OF JUST-IN-TIME LOGISTICS ON EFFECTIVE INVENTORY MANAGEMENT IN CONSTRUCTION PROJECTS IN THE SOUTH-SOUTH REGION OF NIGERIA

Authors

  • Glory Williams Archibong Department of Procurement Management, Federal University of Technology Centre of Excellence in Sustainable Procurement, Environmental and Social Standards (FUTO-sPESS), Imo State, Nigeria
  • Kelechi Enyinna Ugwu Department of Management Technology, Federal University of Technology, Owerri, Imo State, Nigeria
  • Erasmus Ejike Duru Department of Financial Management, Federal University of Technology, Owerri, Imo State, Nigeria

Keywords:

Construction Efficiency, Just-in-Time (JIT) Logistics, Lean Construction, Inventory Management, Material Management

Abstract

The construction industry in Nigeria’s South-South region faces significant challenges in material management, leading to inefficiencies, cost overruns, and delays in project delivery. This study investigates the impact of Just-in-Time (JIT) logistics on effective inventory management in selected construction projects within this region, focusing on the interplay between inventory control and JIT implementation. Utilizing a correlational research design, data were collected from 208 respondents across top, middle, and lower management levels using a validated questionnaire based on a five-point Likert scale. Statistical analysis, including regression and ANOVA, revealed a strong negative correlation (R = 0.751, R Square = 0.564) between JIT logistics and inventory levels, rejecting the null hypothesis that JIT does not affect inventory levels (p = 0.000). Survey results indicated high agreement (88.94%–98.08%) on the importance of inventory management practices, such as real-time tracking and optimal inventory levels, in supporting JIT’s goals of waste reduction and timely material delivery. Major challenges identified include complex return processes (93.27% agreement) and lack of coordination (97.60% agreement), which hinder JIT effectiveness. Proposed strategies to optimize construction efficiency include adopting advanced tracking systems, streamlining return processes, enhancing supplier coordination, implementing lean principles, and providing staff training.

Downloads

Published

2025-10-30

Issue

Section

Articles

How to Cite

ASSESSING THE IMPACT OF JUST-IN-TIME LOGISTICS ON EFFECTIVE INVENTORY MANAGEMENT IN CONSTRUCTION PROJECTS IN THE SOUTH-SOUTH REGION OF NIGERIA. (2025). American Journal of Business Management, Economics and Banking, 41, 103-109. https://americanjournal.org/index.php/ajbmeb/article/view/3151